- Above 54,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 54,000 MW, then the market resolves to Yes.
- Above 54,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 54,500 MW, then the market resolves to Yes.
- Above 55,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 55,000 MW, then the market resolves to Yes.
- Above 57,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 57,000 MW, then the market resolves to Yes.
- Above 60,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 60,000 MW, then the market resolves to Yes.
- Above 58,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 58,500 MW, then the market resolves to Yes.
- Above 58,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 58,000 MW, then the market resolves to Yes.
- Above 59,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 59,500 MW, then the market resolves to Yes.
- Above 56,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 56,500 MW, then the market resolves to Yes.
- Above 59,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 59,000 MW, then the market resolves to Yes.
- Above 63,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 63,000 MW, then the market resolves to Yes.
- Above 55,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 55,500 MW, then the market resolves to Yes.
- Above 57,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 57,500 MW, then the market resolves to Yes.
- Above 60,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 60,500 MW, then the market resolves to Yes.
- Above 56,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 56,000 MW, then the market resolves to Yes.
- Above 62,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 62,000 MW, then the market resolves to Yes.
- Above 61,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 61,000 MW, then the market resolves to Yes.
- Above 61,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 61,500 MW, then the market resolves to Yes.
- Above 62,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 16, 2026 is above 62,500 MW, then the market resolves to Yes.