- Above 64,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 64,000 MW, then the market resolves to Yes.
- Above 64,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 64,500 MW, then the market resolves to Yes.
- Above 65,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 65,000 MW, then the market resolves to Yes.
- Above 66,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 66,000 MW, then the market resolves to Yes.
- Above 66,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 66,500 MW, then the market resolves to Yes.
- Above 65,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 65,500 MW, then the market resolves to Yes.
- Above 67,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 67,000 MW, then the market resolves to Yes.
- Above 70,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 70,000 MW, then the market resolves to Yes.
- Above 67,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 67,500 MW, then the market resolves to Yes.
- Above 68,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 68,500 MW, then the market resolves to Yes.
- Above 69,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 69,000 MW, then the market resolves to Yes.
- Above 69,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 69,500 MW, then the market resolves to Yes.
- Above 68,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 68,000 MW, then the market resolves to Yes.
- Above 71,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 71,000 MW, then the market resolves to Yes.
- Above 70,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 70,500 MW, then the market resolves to Yes.
- Above 71,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 71,500 MW, then the market resolves to Yes.
- Above 72,500 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 72,500 MW, then the market resolves to Yes.
- Above 73,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 73,000 MW, then the market resolves to Yes.
- Above 72,000 MW
- If the highest hourly total system load reported for the ERCOT grid on October 6, 2026 is above 72,000 MW, then the market resolves to Yes.