Tendances
Marchés Associés
Questions liées pour le contexte, et non une comparaison de contrats équivalents.
Will any single datacenter campus reach 2 GW of power capacity by the end of 2027
CoreWeave contracted power capacity in fiscal 2026
CoreWeave power capacity in Q3
Will China ever surpass US gdp?
Will China's GDP surpass US GDP before 2035?
Will China really surpass US GDP by the 2030s?
Règles
Question: Will China's installed datacenter power capacity exceed that of the United States at any point before January 1, 2031, as measured by Rystad Energy? Source: Rystad Energy installed-capacity series for both countries (single source, same methodology).
JSON gratuit pour ce marché, sans clé API :
https://api.coinrithm.com/api/prediction-markets/events/manifold/will-chinas-total-datacenter-powerAgents IA : appelez pm_data_event sur le serveur MCP de CoinRithm :
https://mcp.coinrithm.com/mcp+3 résultats de plus
+8 résultats de plus
+3 résultats de plus