- Above 53,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 53,000 MW, then the market resolves to Yes.
- Above 53,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 53,500 MW, then the market resolves to Yes.
- Above 49,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 49,000 MW, then the market resolves to Yes.
- Above 49,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 49,500 MW, then the market resolves to Yes.
- Above 50,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 50,000 MW, then the market resolves to Yes.
- Above 50,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 50,500 MW, then the market resolves to Yes.
- Above 51,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 51,000 MW, then the market resolves to Yes.
- Above 51,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 51,500 MW, then the market resolves to Yes.
- Above 52,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 52,000 MW, then the market resolves to Yes.
- Above 52,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 52,500 MW, then the market resolves to Yes.
- Above 54,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 54,000 MW, then the market resolves to Yes.
- Above 54,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 54,500 MW, then the market resolves to Yes.
- Above 55,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 55,000 MW, then the market resolves to Yes.
- Above 55,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 55,500 MW, then the market resolves to Yes.
- Above 56,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 56,000 MW, then the market resolves to Yes.
- Above 56,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 56,500 MW, then the market resolves to Yes.
- Above 57,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 57,000 MW, then the market resolves to Yes.
- Above 57,500 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 57,500 MW, then the market resolves to Yes.
- Above 58,000 MW
- If the highest hourly total system load reported for the ERCOT grid on November 18, 2026 is above 58,000 MW, then the market resolves to Yes.